60 MLD SEWAGE TREATMENT PLANT (BASED ON UASB TECHNOLOGY) AT RAS AL KHAIMAH, UAE

 

Design & Consulting Services for the Integrated Sewerage System & Sewage Treatment Project for Public Works & Services Department, Government of Ras Al Khaimah, United Arab Emirates;

 

Assignment From:

Government of Ras Al Khaimah, Ras Al Khaimah, UAE

 

Implementing Agency:

Public Works and Services Department (PWSD), Ras Al Khaimah, UAE

 

Project Location & Capacity of the Plant:

  • 60 MLD UASB STP at Ras Al Khaimah, UAE

  • Sewerage System at Ras Al Khaimah, UAE

Period of Assignment:

2001 - 2006

 

Funding Agency:

Government of Ras Al Khaimah, Ras Al Khaimah, UAE

 

Scope of Work for Consultancy Services:

Design and Detailed Engineering of Sewerage and Sewage Treatment Systems

  • Inception report and finalization of work plan based on which the project implementation will be undertaken.

  • Review the Master plan prepared by Halcrow, all relevant available data, reports, drawings and maps provided by PWSD.

  • Establishment of baseline information for preparation of design and detail engineering.

  • Review of Surveys and investigations data on topography, soil investigations to be provided by the PWSD.

  • Review available data on topography, soil and contours.

  • Review of Wastewater characterization.

  • Develop Preliminary design and validation of design by Public works department.

  • Preparation of detail designs and engineering drawings.

  • Preparation of Bill of quantities and cost estimates.

  • Preparation of tender documents.

Construction Supervision

  • Construction supervision and advisory services.

  • Commissioning and trial runs.

  • Preparation of O&M Manual.

  • Training of PWSD staff for O&M of the STP.

  • Technical advise for establishing the STP laboratory.

  • Operation and management of pumping stations and sewage treatment plant for one year.

Description of the Project:

The city of Ras Al Khaimah has grown enormously and there is no sewerage or sewage treatment system for residential areas within Ras Al Khaimah. Sewage is generally directed to poorly maintained soakways, which discharges approx. 24,800 m3 of sewage into the ground every day. This leads to groundwater contamination, which is not environment friendly. The environmental conditions in the most congested areas turn worse, especially during rainy period, wherein water logging takes place and pollution overflows leading to serious health problems. The problems will escalate further as the city grows. At present less than 4% of the waste is removed by tankers.

 

PWSD, RAK proposed that to handle the wastewater generated from the spread out localities and developments, there is an imperative need to develop an extensive sewerage network and sewage treatment systems. PWSD initiated the process and in September 2000 a master plan was prepared for the collection, conveyance and treatment of sewage for the total population of Ras Al Khaimah. The objectives of the plan were to provide immediate solutions to the short-term environmental problems and ensure that the solution will be compatible with long-term development. Within this purview, PWSD, RAK requested IRAMCONSULT, Washington DC, USA in July, 2001 to prepare the Detailed Design and Engineering details of the Integrated Sewerage System and Sewage Treatment Plant, as conceived in the master plan with necessary modifications.

 

It is proposed to construct a sewage treatment plant and the sewerage network in a time frame of 4-6 years to deal with the wastewater of the city. The PWSD proposes to prioritize the construction of the sewerage system based on the priority of the areas vis-à-vis the population, economic growth, current environmental conditions, etc.

 

 
 