"Protecting the Earth and Mapping it too!"

 

Your Location > Home > Projects > Environmental Management & Technology

 

6 PUMPING STATIONS UNDER THE RIVER SUTLAJ ACTION PLAN PROJECT, PUNJAB STATE, INDIA

 

6 Main Pumping Stations at Jalandhar, Bhatian, Baloke, Jamalpur, Phagwara (North) and Phagwara (South) under Sutlej River Action Plan, Punjab

 

Assignment from:

Punjab Water Supply and Sewerage Board (PWSSB), Chandigarh

 

Period of Assignment:

1998 - 1999 (6 to 9 months)

 

Funding Agency:

The National River Conservation Directorate (NRCD), Ministry of Environment & Forests, New Delhi

 

Scope of Work for Consultancy Services:

  • Preparation of Process and Hydraulic Design to meet effluent discharge standards specified by Andhra Pradesh Pollution Control Board

  • Preparation of detailed Structural Design

  • Preparation of Engineering Drawings, DPR and Tender Documents

  • Advise in Tender Appraisal

  • Construction supervision

  • Commissioning, Process Start-up and Monitoring

  • Preparation of O&M manuals

Description of the Project:

The National River Conservation Directorate (NRCD), Ministry of Environment & Forests formulated Sutlej River Action Plan (SRAP) Project for prevention of pollution in river Sutlej stretching through Punjab. There are 3 towns in Punjab where pollution abatement schemes are being implemented. In all these towns a major component of the pollution abatement scheme is sewage treatment and hence Sewage Treatment Plants (STPs) shall be constructed.

 

Based on the requirements and sewage generated, there are 6 Main Pumping Stations which shall be designed & constructed in Punjab. The NRCD is the nodal agency for this project.

 

 
 
Copyright © 2006 Reserved.  IRAM EarthCAD Consulting Pvt. Ltd.